Revision:
C008
Description:
BRAZING PROCEDURE IAW NAVSEA 0900-LP-001-7000 FOR APPROVAL
Clause:
"This requirement may be satisfied by one of the following methods.1. PROCEDURE SUBMITTAL:Prior to performing any fabrication brazing to NAVSEA 0900-LP-001-7000, submit fabrication brazing procedure(s)and procedure qualification test report(s) in accordance with Appendix K for approval within 30 days after receipt of this purchase order. Include clearly marked on the submittal:a. This current purchase order/item number(s),b. NN Material Number(s),c . This coded note number,d. The procedure number/revision,e. The procedure qualification record number(s), evidence of prior Navy approval (if available),f. The fabrication specification (i.e. NAVSEA S9074-AR-GIB-010/278, Project Pecuiliar Document (PPD) 802-7094539, NAVSEA T9074-AD-GIB-010/1688, etc.).In the event the scheduled date for submittal cannot be met, the supplier shall provide a complete list of all documents and revisions to be used in advance of submittal. Full compliance to this submittal requirement is expected.It is highly recommended for development of any new brazing procedure(s) or reformatting/revising of existing procedure(s) required for the manufacture of the items listed herein be performed using NavWeld software. A license for NavWeld has been secured for NNS suppliers. To gain access to NavWeld contact Troy Paskell at paskell@weldqc.com or (614) 487-7207. A temporary password will be provided as well as training on how to use NavWeld. Reformatted or revised existing welding procedures must include a copy of the original PQR along with the welding procedure submittal.2. NOTIFICATION OF (UNLISTED) APPROVED/PENDING APPROVAL PROCEDURE(S):If previous approval for brazing to 0900-LP-001-7000 has been obtained from NNS OR the procedure has been submitted and is pending approval from NNS but the procedure number and revision is not listed on this purchase order/item, re-submittal of the procedure is not required. Submit notification of the previous OR pending approval, including 1.a through f. above and the PO and item number of the previous submittal. For previously approved procedure, also include the previous approval letter number/identification.3. USE OF (LISTED) APPROVED PRPCEDURE(S):If the brazing procedure to 0900-LP-001-7000 used is listed on this purchase order/item, with the exception of procedures used to weld repair castings, this requirement is satisfied, the supplier is authorized to perform work and no submittal is required.The above requirements do not relieve the seller of his responsibility to comply with the specification requirements of the purchase order.All casting weld repair requests and approval of the procedure(s) and applicable procedure qualification test report(s) shall be by Vendor Information Request (VIR) in accordance with Appendix ""A"".RT FILM SUBMITTAL FOR PROCEDURE QUALIFICATION:Welding Procedure Qualification Records (PQRs) in accordance with MIL-STD-248D or NAVSEA S9074-AQ-GIB-010/248 for which radiography (RT) inspection is required and which have not been previously approved shall require submittal of the RT film and RT data for review and approval as defined in Appendix K, Section VI.WELDER WORKMANSHIP TRAINING PROGRAM:Supplier must have a Welder Workmanship Training Program as described in Appendix K, Section V.Documents/extensions shall be submitted as follows:SPARS (Shipbuilding Partners and Suppliers) enabled suppliers are required to submit through https://spars.huntingtoningalls.com/ngcspars/Author mail to:Newport News Shipbuilding4101 Washington Ave.Newport News, VA 23607ATTN: E68 Software CoordinatorBLDG. 902-2"